Skip to main content

Archive - Mar 4, 2013

Date

Pilot Project Gets Green Light

March 4, 2013

CELINA — A pilot aeration study has been approved for Grand Lake St. Marys to use solar powered aeration equipment in two locations, with the goal of potentially lowering Celina’s water toxicity before water treatment and opening Second Beach at St. Marys.

Grand Lake St. Marys Restoration Commission Manager Milt Miller made the announcement during Saturday’s Lake Improvement Association meeting. Miller has long touted the need for increased aeration in the lake as a way to improve its water quality.

Tue., March 31 Area Schedule Baseball New Bremen at Houston Minster at Russia Softball New...
Baseball Fort Recovery 7, Celina 3 Elida 12, Fort Jennings 8 Kenton 7, Upper Sandusky 5...
VERSAILLES — The Minster girls track team coasted to a season-opening win in the black...

 

Premium Drupal Themes by Adaptivethemes