Skip to main content

Archive - Mar 4, 2013

Date

Pilot Project Gets Green Light

March 4, 2013

CELINA — A pilot aeration study has been approved for Grand Lake St. Marys to use solar powered aeration equipment in two locations, with the goal of potentially lowering Celina’s water toxicity before water treatment and opening Second Beach at St. Marys.

Grand Lake St. Marys Restoration Commission Manager Milt Miller made the announcement during Saturday’s Lake Improvement Association meeting. Miller has long touted the need for increased aeration in the lake as a way to improve its water quality.

PIQUA — Minster football is  headed to the state semifinals for the first time since...
TROTWOOD MADISON 34, WAPAKONETA 28 SIDNEY — Two lost fumbles by the Wapakoneta Redskins...
Ohio High School Playoff Football Division II Cin. La Salle 38, Cin. Mt. Healthy 6 Lewis...

 

Premium Drupal Themes by Adaptivethemes