Skip to main content

Archive - Mar 4, 2013

Date

Pilot Project Gets Green Light

March 4, 2013

CELINA — A pilot aeration study has been approved for Grand Lake St. Marys to use solar powered aeration equipment in two locations, with the goal of potentially lowering Celina’s water toxicity before water treatment and opening Second Beach at St. Marys.

Grand Lake St. Marys Restoration Commission Manager Milt Miller made the announcement during Saturday’s Lake Improvement Association meeting. Miller has long touted the need for increased aeration in the lake as a way to improve its water quality.

Celina 59, St. Marys 49 Celina stayed atop the WBL in this showdown of league unbeatens behind...
Celina 48, St. Marys 43 St. Marys hit  two of their first 20 shots and finished the game...

 

Premium Drupal Themes by Adaptivethemes